Book a WhatsApp demo
FREE TOOLS FOR GARMENT FACTORIES

Garment Cost Sheet Template: Free Calculator + CSV

Fill in one style line by line. Fabric, trims, thread, CM, washing or printing, costs outside CPM and profit total live to an FOB price per piece. No signup.

Garment Cost Sheet

Pre-filled with the polo shirt example from our garment costing guide. Replace every number with your own. Totals update as you type. Each line is rounded to 2 decimals, as on a printed cost sheet.

Use one currency for every price on the sheet
A. Fabric

Fabric cost = consumption per piece × price per unit. Use kg or metres, but the same unit for both fields.

kg or metres per garment
0 if the style has none
Cutting loss, applied to both fabrics
B. Trims & accessories

Cost per garment for each item (buttons, labels, tags, polybag, zipper…).

C. Thread
Cone price ÷ metres per cone
D. CM (cut & make)

Sewing CM = SMV × cost per minute (CPM). Your CPM already includes efficiency, so do not divide by efficiency again.

Leave 0 if cutting staff are already in your CPM cost base
Costed at the same CPM. Leave 0 if finishing staff are already in your CPM cost base
E. Washing & printing
0 for the plain polo example
F. Costs outside CPM & profit
Do not put rent, power or admin here if they are already in your CPM
Download CSV (opens in Excel/Google Sheets)
Rs 337.11
FOB price per piece

Cost sheet breakdown
Line itemWorkingCost / pc
Fabric = consumption × price; wastage = fabric × wastage %
Sewing CM = SMV × CPM
Costs outside CPM = (A+B+C+D+E) × that % (0 when your CPM is all-in)
Profit = (A+B+C+D+E + costs outside CPM) × profit %
FOB = A+B+C+D+E + costs outside CPM + profit
CMT order? If the buyer supplies the fabric, set both fabric consumptions to 0. The total is then your CMT price per piece (labour, trims, thread, the costs-outside-CPM line and profit; set that line to 0 if the buyer pays freight). The difference between CM, CMT and FOB is explained in the costing guide.

What is a garment cost sheet?

A garment cost sheet is a line-by-line breakdown of what one finished piece costs to make: fabric, trims, thread, cut-and-make labour, washing or printing, costs outside the CPM (such as freight to port) and profit. Merchandisers use it to quote a buyer, and later to check whether the order actually made money. One sheet is made per style.

How do you calculate the FOB price on a cost sheet?

Add the direct costs first: fabric (consumption × price, plus wastage), trims, thread, CM (SMV × cost per minute; add cutting and finishing only if those staff are outside your CPM) and washing or printing. If your cost per minute is all-in (rent, power, admin and support staff included), add only costs that sit outside it, such as finance, testing, freight to port or commission; then apply your profit percentage. The total is the FOB price per piece.

Garment cost sheet example: men's polo shirt

These are the default numbers in the calculator above. They come from the worked example in our garment costing CMT calculation guide, using example costs in Nepali rupees. They are an example, not a benchmark: your fabric prices, SMV and CPM will differ.

Do not count a cost twice. The example uses an all-in CPM, as in our costing guide: rent, power, admin, helpers and support staff (including cutting and finishing helpers) are already inside the Rs 2.91. So cutting % and finishing minutes are 0, and the only extra line is 3% for costs the CPM never includes: freight to port and export clearance (an illustrative figure inside the guide’s 2–5% logistics range; use your own). If your CPM covers sewing labour only, enter cutting and finishing, and put your other factory costs in the costs-outside-CPM line instead.

Polo shirt cost sheet example in NPR
Line itemWorkingRs / pc
Shell fabric (pique)0.28 kg × 650182.00
Rib fabric0.04 kg × 70028.00
Fabric wastage 7%210.00 × 7%14.70
A. Fabric224.70
B. Trims (8 items)4.50 + 2.50 + 1.00 + 1.50 + 2.00 + 2.00 + 1.50 + 2.0017.00
C. Thread180 m × 0.0122.16
SewingSMV 14 × CPM 2.9140.74
Cuttingin CPM cost base0.00
Finishing, pressing, packingin CPM cost base0.00
D. CM40.74
E. Washing / printingnone on this style0.00
Subtotal A to E284.60
Costs outside CPM 3% (freight to port, export clearance; illustrative)284.60 × 3%8.54
Profit 15%(284.60 + 8.54) × 15%43.97
FOB price per piece337.11

Fabric is Rs 224.70 of Rs 337.11, about 67% of FOB. CM is Rs 40.74, about 12.1%. That is why fabric consumption and wastage deserve the closest checking on any cost sheet.

About the free download

The download is a CSV file, not an .xlsx workbook. CSV opens in Excel, Google Sheets and LibreOffice, but it cannot reliably store formulas, so the file does not calculate on its own. It holds the same line items as the calculator, the polo example values, and a column that spells out each formula in words.

How to turn it into a working Excel sheet

  1. Open the CSV in Excel or Google Sheets and save it as .xlsx or a Google Sheet.
  2. In the cost column, replace each example value with a formula that follows the note beside it, for example quantity × rate for fabric.
  3. Point the costs-outside-CPM, profit and FOB rows at the subtotal cell so they update together.

If you would rather not build formulas, this page does the arithmetic. Fill it in and copy the totals into your quote.

Related guides and tools

Stop Guessing Your Cost per Minute. Measure It.

Your CPM depends on line efficiency. Scan ERP calculates line efficiency automatically, from QR scan data, in real time, with zero manual entry.

Book a Free Demo